8. Best Public Sector Entrant /Investor in Wind Power - (1st prize only)
The Best Public Sector
Entrant in Wind Power during 2006-07 and 2007-08 award is being
instituted to accord recognition to the PSU with the largest commissioned wind
power capacity in the years 2006-07 and 2007-08. The Awards Jury will take a
decision based on information provided by the concerned PSUs.
Qualifying Criteria
-
All
PSUs (Central Sector) with commissioned wind power capacity as on 31 March
2007 and 2008. (Annual and Cumulative addition)
-
All
PSUs (State Sector) with commissioned wind power capacity as on 31 March 2007
and 2008. (Annual and Cumulative addition)
-
Minimum
5 MW should have been installed during 2006-2008